welcome to the organic green doctor blog

i am a family physician who was diagnosed with
early mild cognitive impairment(mci) amnestic type on december 21, 2010
this is a precursor to alzheimers disease
because of this diagnosis i have opted to stop practicing medicine
this blog will be about my journey with this disease
please feel free to follow me along this path
i will continue blogging on organic gardening, green living,
solar power, rainwater collection, and healthy living
i will blog on these plus other things noted to be interesting

Thursday, March 1, 2012

oil prices, habitat

OIL PRICES


this story sounds a lot alike those we heard in 2008 and 2009
why is the price of oil going so high
when the consumption of gas has actually dropped in the us
some say we are now actually becoming a net exporter of oil

well here we go
its due to speculation by wall street financial speculators
that are driving up the price of oil so that they can make
profits off the rise

im sure they hope iran continues to stir things up over
in the middle east

apparently the government use to limit how much of the oil
they could speculate with but now its not limited
attempts to regulate this is failing
seems someone has a lot of influence in congress and with
regulating groups

we know who always pays when this happens
you and i

some estimate if you drive an energy efficient car that you
pay $7+ a tank of gas for that speculation
or about $700+ a year for those wall street financial
speculators to take home from your pockets to theirs
sucks doesnt it

drill baby drill wont fix this problem
it will take some stronger regulations to right this wrong
so we all wont be continuously screwed by the financial
guys again
who doesnt have the cojones to do this

the answer is your congressman
probably not the president or the next president
they need to feel the heat as they are not re-elected or elected
this year

$5.00 a gallon is going to really make us all mad
lets do something about it

HABITAT
finished all the siding finally
almost all the outside moulding is finished
the outside is about 75% painted
the roof is almost 100% completed
the central heat air is in place
the electric lines are all ran
now most of the work will go inside and
will probably seem to slow down

as the house is going up its seems to move so
fast as its being built but
as the more detailed things have to be done then the
speed seems to slow down a lot

thats kinda how life is

the organicgreen doctor

No comments:

Post a Comment